Categories

Tags

Publications

Prepared by Chemung County Water Quality Strategy Committee

File Name: ChemungCoWaterQualityStrategy_August2024.pdf
Size: 2.72 MB
Modified: 08/28/2024

OVERVIEW OF STC’S REGION (CHEMUNG, SCHUYLER, AND STEUBEN)

This CEDS 2024 update will be the final annual update to STC’s 2020 Comprehensive Economic Development Strategy; this will also be the final annual update produced by STC, as the Economic Development Administration (our funder) does not require an annual narrative from Economic Development Districts like STC.  STC is moving in a new direction with our EDA funding; STC will have increased resources for EDA project development, and regional economic studies at the direction of the EDPSC in the coming years.  Discussion with the Economic Development Policy and Strategy Committee in 2024 and 2025 will guide the development of a replacement reporting tool; the new reporting tool will be used from 2025-2029.

 

File Name: Adopted2024CEDSUpdate.pdf
Size: 4.71 MB
Modified: February 16th, 2024
File Name: STCAdopted2022CEDS.pdf
Size: 3.04 MB
Modified: September 12th, 2024
File Name: DeterminingSlope.pdf
Size: 0.65 MB
Modified: 06/19/2021

Guidance for avoiding runoff and erosion problems

File Name: WaterRunsDownhill_Guidance.pdf
Size: 0.64 MB
Modified: 06/10/2021
File Name: FloodSmartPlan_CohoctonRiver_2019.pdf
Size: 13.19 MB
Modified: 09/30/2019
File Name: FloodSmartPlan_Appendices_2019.pdf
Size: 7.23 MB
Modified: 09/30/2019

Guidance for identifying potential projects

File Name: Flood_Attenuation_Opportunities_Elmira.pdf
Size: 9.58 MB
Modified: 02/29/2012

Study completed by Southern Tier Central Regional Planning & Development Board in collaboration with Steuben County Planning and the Institute for Human Services (2017).

Category: Planning
File Name: SCTSReport_FINAL_SY.pdf
Size: 5.41 MB
Modified: August 27th, 2020

A guide for preserving rural and small town character while planning for the future. The guide was generated as part of a larger project in Schuyler County, funded by the NYSERDA Cleaner, Greener Communities program.

Category: Planning
File Name: SchuylerPlanningGuide_final20170413_hires.pdf
Size: 38.33 MB
Modified: August 27th, 2020

Design guidelines completed for the Villages of Painted Post and Riverside by a team from Pratt University. The document was generated as part of a project funded by the NYSERDA Cleaner Greener Communities program.

File Name: STCFinalReportVerion2.pdf
Size: 27.65 MB
Modified: August 27th, 2020