Categories

Tags

Agenda – *Tyoga Container – Clarification of two conditions passed last month.
Category: Planning
File Name: 21_3_3_minutes_CR_Final-Painted-Post-Planning-1.pdf
Size: 0.21 MB
Modified: March 24th, 2021
Agenda – *Tyoga Container Project Complete Application Review
Category: Planning
File Name: 21_2_3_minutes_Y2-Painted-Post-Planning_Final-cr.pdf
Size: 0.20 MB
Modified: March 24th, 2021
Agenda – *Tyoga Container Project Update – Noise study, vibration study
Category: Planning
File Name: 21_1_6_minutes_cr-Y1-Painted-Post-Planning.pdf
Size: 0.22 MB
Modified: March 24th, 2021
Category: Planning
File Name: SEQR-Neg.Dec_..pdf
Size: 0.46 MB
Modified: March 1st, 2021
Category: Planning
File Name: VTE-Responses-Tyoga-Container-Painted-Post-01-29-2021.pdf
Size: 0.26 MB
Modified: February 2nd, 2021
Tyoga’s formal update letter regarding the status of the proposed project in Painted Post.
Category: Planning
File Name: TYOGA-FORMAL-LETTER-UPDA_20210104140925.pdf
Size: 0.13 MB
Modified: January 4th, 2021
A noise impact study was conducted to analyze the noise impacts of the proposed 600,000-square foot Tyoga container Warehouse Facility at 450 West Water St., and the noise impact of semi-trucks passing the properties located along the West Water Street access road both during the day and at night.
Category: Planning
File Name: TYOGA-NOISE-IMPACT-STUDY_20210104140735.pdf
Size: 1.04 MB
Modified: January 4th, 2021
This vibration impact study has been conducted to analyze the vibration impacts of the proposed 600,000-square foot Tyoga Container Warehouse Facility at 450 West Water St, and the vibration impact of semi-trucks passing the properties located along the West Water Street access road.
Category: Planning
File Name: TYOGA-VIBRATION-IMPACT-S_20210104140438.pdf
Size: 3.01 MB
Modified: January 4th, 2021

Review of Traffic Impact Study completed by Fagan Engineers. As presented at September 2 Planning Board meeting.

Category: Planning
File Name: FE_Review_08-26-2020.pdf
Size: 0.16 MB
Modified: October 13th, 2020

Comments on Tyoga Stormwater Pollution Prevention Plan (SWPPP) as prepared by NYS Department of Environmental Conservation

Category: Planning
File Name: NYSDEC_Preliminary_Comments_for_Tyoga_Container.pdf
Size: 0.09 MB
Modified: October 13th, 2020

Letter containing a description of applicant relationship with tenant, use of building, and commitment to implementing pedestrian crossing(s).

Category: Planning
File Name: SKM_C30820080508340.pdf
Size: 0.09 MB
Modified: October 13th, 2020

Traffic Study as provided by Larson Design 7/30/2020

Category: Planning
File Name: 2020-07-30_Traffic_Study.pdf
Size: 8.77 MB
Modified: October 13th, 2020

Application packet, PILOT Assessment and Cost-Benefit Analysis as provided by Steuben County IDA

Category: Planning
File Name: Tyoga-Container-Application-Package.pdf
Size: 0.84 MB
Modified: October 13th, 2020

Answers to the most frequently asked questions as generated from the July 22nd public hearing and subsequent letters to the Village.

Category: Planning
File Name: TYOGA_722PublicHearing_FAQ1.pdf
Size: 0.73 MB
Modified: October 13th, 2020

Special Meeting Agenda – *Tyoga Container – Second public hearing

Category: Planning
File Name: 20_7_22_minutes_SY.pdf
Size: 0.19 MB
Modified: March 24th, 2021

Answers to the most frequently asked questions as generated from the June 3rd public hearing and subsequent letters to the Village.

Category: Planning
File Name: Responses_to_comments_from_the_June_3_copy.pdf
Size: 0.14 MB
Modified: October 13th, 2020

Painted Post Planning Board Meeting Minutes

Category: Planning
File Name: 20_6_3_minutes_SY.pdf
Size: 0.19 MB
Modified: March 23rd, 2021

SEQR Full Environmental Assessment Form Part 1 & 2. Part 1 was completed by applicant, deemed a Type I action, and moved to coordinated review. Part 2 was completed by the Planning Board on May 13, providing a basis for required Environmental Impact Statement (EIS) components. EIS and final determination have not yet been completed or included in this document.

Category: Planning
File Name: SEQR_FULLEAFPart12_COMPLETE.pdf
Size: 8.45 MB
Modified: October 13th, 2020

This document contains the SEQR Coordinated Review submission from DEC and responses from Tyoga Container.

Category: Planning
File Name: SEQR_DECREVIEW_RESPONSE.pdf
Size: 4.26 MB
Modified: October 13th, 2020

Notice distributed to interested residents at Village Mini-Mart, West Water Street homes, and on the STC website home page. Public hearing was held on Wednesday, June 3.

Category: Planning
File Name: PUBLICHEARING_TYOGA_AD.pdf
Size: 0.08 MB
Modified: October 13th, 2020

© Southern Tier Central Regional Planning & Development Board2021All Rights Reserved